Question: Sometimes, the constraints in optimization problems look like sub(a,1)sub(x,1)+...+sub(a,n)sub(x,n)c, assuming n decision variables. In general the questions lools like could the be replaced with a
Sometimes, the constraints in optimization problems look like sub(a,1)sub(x,1)+...+sub(a,n)sub(x,n)c, assuming n decision variables. In general the questions lools like "could the be replaced with a strict inequality " In order to get a feel for it, we'll look at a specific case. Consider the problem to maximize x, subject to x<10. Does this problem have a solution
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
