Question: Sort this out: Only e and fe) Using the longest time task rule, balance the line with theminimum number of stations to produce 400 units
Sort this out: Only e and fe) Using the longest time task rule, balance the line with theminimum number of stations to produce 400 units per dayf) Draw the diagram with the balance made and the new Line Efficiency \( =245 / 288=85.06 \% \)The following tasks must be performed on an assembly line in the sequence and times specified: a. Draw the precedence diagram. b. Determine the theoretical m 2 answers