Question: Sox Engineering designs and constructs air conditioning and heating (HVAC) systems for hospitals and in Currently the company's staff is verded with design work. There

Sox Engineering designs and constructs air
Sox Engineering designs and constructs air
Sox Engineering designs and constructs air
Sox Engineering designs and constructs air conditioning and heating (HVAC) systems for hospitals and in Currently the company's staff is verded with design work. There is megne in weeksThe penalty for completing the designate is $15.000 per week, ne delay will cause the facility to open ther than antipated, and count the engine the companys de engineers to complete the wil have to pay them overtime for all work Soxha emated that it will cost $11.000 per week wage and adding a way complete the design Sox is also considering have an outside angeringfim do the design Abid 506,000 has been received for the completed design and informing the desconto conduct a joint design by having a third einering company complete all electromechanical components of the designat a cost of 100.000 So would then complets of the nomat animated cost of 28,000 Sox hastimated the following probabies of competing the project with various frames when using each of the tree to those who Three Weeks Late Option Infomal Ergo External Engineers Joint Design On Time 04 03 02 Probability of Completing the Design One Week Late Two Weeks Late 04 02 0.3 02 0.3 02 0.1 0.1 The expected monetary value using inside engineers to complete the design is $(Enter your response as an integer) The expected monetary value using an outside engineering firm to complete the design is $(Enter your response as an integer) The expected monetary value of conducting a joint design is $(Enter your response as an integer) What is the best decision based on an expected monetary value criterion? O Joint design O Internal engineers External engineering firm Sex Engineering design and conditioning and HVAC) term for optie Comedy the company staff is wat will de Team wool. The penalty for completing the design 515,000 per week any delay with any content and the company engineers to come the design, it wil have to pay them overtime for all work so that it will cool 1.000 per week wage and when we complete the design to coding having and ning fim de design And of 16.000 ved for the common Yotion from the conduct a point design by having the engineering company complete all electromechanical and color 00000 sow whethed and cost of $20,000 Setia se following probabilities of completing the propone unicach room. Those who the Three Week 0 0. Probaby Corting the Option On One West Late Two Weeks Late wernal 04 En 03 Joint Design 02 The end og engines to come on yowasan Thered try value in de arginering from The expected try to conducting and into your restare

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!