Question: Specifications: a . Topsoil is 9 deep b . Finished floor is either commercial grade carpet or slate tiles ( 1 2 X 1
Specifications:
a Topsoil is deep
b Finished floor is either commercial grade carpet or slate tiles X
c Bottom of footing is minimum below grade.
d Plywood siding TIII if requested.
e Use psi colored concrete for the slab and foundation wall, when needed.
f groveandtongue PLY is used for subfloor, if applicable.
g Roof pitch is :
h Floor elevation is above sea level or minimum above ground elevation.
i Concrete is used for the footing.
j CMU's are of standard size.
k Bricks are of modular size red, clay bricks.
Standard size vapor barrier sheets are used for each exterior wall assembly type.
m ply is used for roof deck with # felt below fiberglass shingles
n Girders are made with X spruce and placed oc
Directions: USE THE FLOOR PLAN AND APPLICABLE SECTION DETAILS WITH APPLICABLE SPECIFICATION ITEMS TO DETERMINE QUANTITIES
Be sure to: SHOW STEPBYSTEP CALCULATIONS, INCLUDING DESCRIPTIONS.
Apply a swell factor of percent to determine the number of cubic yards of dirt that must be excavated to pour the continuous footingfoundation wall of the building.
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock