Question: Spin Cycle Architecture uses three activity pools to apply overhead to its projects. Each activity has a cost driver used to allocate the overhead costs
Spin Cycle Architecture uses three activity pools to apply overhead to its projects. Each activity has a cost driver used to allocate the overhead costs to the projects. The activities and related overhead costs are as follows: initial concept formation $40,000; design $300,000; and construction oversight $100,000. The cost drivers and estimated use are as follows.
| Activities | Cost Drivers | Estimated Use of Cost Drivers per Activity | ||
| Initial concept formation | Number of project changes | 20 | ||
| Design | Square feet | 150,000 | ||
| Construction oversight | Number of months | 100 |
(a) Compute the predetermined overhead rate for each activity.
| Overhead Rate | |||
| Initial concept formation | $ | per project change | |
| Design | $ | per square foot | |
| Construction oversight | $ | Per month | |
(b) Classify each of these activities as unit-level, batch-level, product-level, or facility-level.
| Activities | Level | |
| Initial concept formation | Facility-levelUnit-levelBatch-levelProduct-level | |
| Design | Product-levelUnit-levelBatch-levelFacility-level | |
| Construction oversight | Facility-levelBatch-levelUnit-levelProduct-level |