Question: Step 1) Create a Resource Sheet like the one included as Table 4. Some of the resources are work resources (personnel), some are material resources,
Step 1) Create a Resource Sheet like the one included as Table 4. Some of the resources are work resources (personnel), some are material resources, and one is a cost resource. Some of the resources are grouped as teams (for example, the Concrete Crew has four individuals assigned to it). If the resource is a team of two or more individuals, the standard cost (hourly rate) is based on the cost of all individuals in the team (if you use the Concrete Crew for 1 hour, it will cost you $200 - If you work them overtime, it will cost you double time, or $300. Each individual worker on that team is paid $50/hour standard, $75/hour overtime). Some individuals or teams charge double overtime, some time-and-a-half, and so on. Step 2) Assign the work resources listed in Table 5 to their corresponding tasks. In addition, assign 10 cubic yards of concrete each to the pour footings, poor basement floor and pour basement walls work packages (this is an example of using the assign [materials] resource feature). Step 3) Name Your file use the following convention: (Your Full Last Name, First name initial)-(P3A). Save your Resource Sheet Page file in PDF format and submit it through Canvas. Table 4. Project Resources Resource Name Type Initials Max. Units Std. Rate Ovt. Rate Grading crew (3) Work Grade 100% $180.00/hr $360.00/hr Concrete crew (4) Work Concrete 100% $200.00/hr $300.00/hr Framing crew (4) Work Framers 100% $120.00/hr $180.00/hr Roofing crew (3) Work Roofers 100% $150.00/hr $225.00/hr Electrician (2) Work Elec 100% $100.00/hr $200.00/hr Plumber (2) Work Plumb 100% $120.00/hr $240.00/hr HVAC (2) Work HVAC 100% $80.00/hr $160.00/hr Insulation (2) Work Insul 100% $60.00/hr $90.00/hr Drywall (3) Work Drywall 100% $75.00/hr $150.00/hr Flooring Work Flooring 100% $25.00/hr $25.00/hr Painter (3) Work Paint 100% $90.00/hr $135.00/hr Trim carpenter Work Trim 100% $50.00/hr $75.00/hr Concrete mix Material Mix $24.00 2x4x8 Material lumber $3.00 4x8 OSB Material OSB $12.00 Nails Material Nails $4.00 Catering Cost Cater General Contractor Work GC 100% $200.00/h $200.00/h Table 5. Work Resources Grading and site prep Grading crew (3) Foundation construction Concrete crew (4) Framing Framing crew (4) Installation of windows/doors Framing crew (4) Install Metal Roofing Roofing crew (3) Siding Framing crew (4) Rough electrical Electrician (2) Rough plumbing Plumber (2) Rough HVAC HVAC (2) Insulation Insulation (2) Drywall Drywall (3) Underlayment Flooring Trim Trim carpenter Painting Painter (3) Finish electrical Electrician (2) Bathroom/kitchen counters and cabinets Trim carpenter Finish plumbing Plumber (2) Carpet/flooring Flooring Finish HVAC HVAC (2) Hookup water/well Plumber (2) Hookup sewer Plumber (2) Punch list General Contractor
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
