Question: Step by step solution using flexsim A shop floor consists of three machines and produces three types of products. Each machine is dedicated to process

Step by step solution using flexsim
A shop floor consists of three machines and produces three types of products. Each machine is dedicated to process a particular type of part. The machine processing time is 8 minutes and parts arrives at the shop floor each in 3 minutes. Currently an operator (travel speed 5m/min) is involved in transferring the product from the storage to the three machines. A transporter (speed 20 m/min) carries bunch of 6 items to the sink. Run time for machine 1128 minutes. Find,
1.Throughput of shop floor. (Refer provided excel sheet for run time value).
2. Find output by type.
3. Suggestions for optimizing the shop floor
Position the resources in model area, as per provided table.
Resource Position (X,Y,Z)
Source (-20,0,0)
Sink (5,0,0)
Storage (-15,0,0)
Machine 1(-9,7,0)
Machine 2(-9,1,0)
Machine 3(-9,-5,0)

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!