Question: SUBJECT:IDSC MAJOR: MIS From the reading: Why Projects Fail? Match three reasons project fail to the appropriate phase of the SDLC , justify with specific

SUBJECT:IDSC MAJOR: MIS

From the reading: "Why Projects Fail?" Match three reasons project fail to the appropriate phase of the SDLC , justify with specific deliverable and/or technique from the SDLC phase.

Refer to Figure 1-2 on page 9 of the text book. Feel free to state reasonable assumptions to address any ambiguity.

Example: Unmanaged risks are addressed by the risk assessment deliverable of the PLANNING phase of the SDLC.

choose 3 below this

1. Unrealistic or unarticulated project goals 2. Inaccurate estimates of needed resources 3. Badly defined system requirements 4. Poor reporting of the projects status 5. Unmanaged risks 6. Poor communication among customers, developers, and users 7. Use of immature technology 8. Inability to handle the projects complexity 9. Sloppy development practices 10. Poor project management 11. Stakeholder politics 12. Commercial pressures

TEXTBOOK:

Phase Chapter Step Technique Deliverable
Planning 1 Identify opportunity Project identification System request
Focus: Why build this system? 1 Analyze feasibility

Technical feasibility

Economic feasibility

Organizational feasibility

Feasibility study
How to structure the project? 2 Develop workplan Time estimation Project plan

Primary outputs:

  • System request with feasibility study
  • Project plan

Task identification

Work breakdown structure

PERT chart

Gantt chart

Scope management

Workplan
2 Staff project

Project staffing

Project charter

Staffing plan
2 Control and direct project

CASE repository

Standards

Documentation

Timeboxing

Risk management

Standards list

Risk assessment

Analysis 3 Develop analysis strategy Business process automation System proposal
Focus: Who, what, where, and when for this system? 3 Determine business requirements

Business process improvement

Business process reengineering

Interview

Requirements definition
Primary output JAD session
System proposal

Questionnaire

Document analysis

Observation

4 Create use cases Use case analysis Use cases
5 Model processes Data flow diagramming Process models
6 Model data

Entity relationship modeling

Normalization

Data model
Design 7 Design physical system Design strategy

Alternative matrix

System specification

Focus: How will this system work? 8 Design architecture

Architecture design

Hardware and software selection

Architecture report

Hardware and software specification

Primary output:

  • System specification
9 Design interface

Use scenario

Interface structure

Interface standards

Interface prototype

Interface evaluation

Interface design
10 Design programs

Data flow diagramming

Program structure chart

Program specification

Physical process model

Program design

11 Design databases and files

Data format selection

Entity relationship modeling

Denormalization

Performance tuning

Size estimation

Database and file specification

Physical data model

Implementation 12 Construct system Programming Test plan
Focus: Delivery and support of completed system

Software testing

Performance testing

Programs

Documentation

Primary output:

  • Installed system
13 Install system Conversion strategy selection

Migration plan

Conversion plan

Business contingency plan

Training Training plan
13 Maintain system

Support selection

System maintenance

Project assessment

Support plan

Problem report

Change request

13 Postimplementation Postimplementation audit Postimplementation audit report

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!