Question: summarizeCurrently, the contractor's utilize their trailers as a power source for activities such as prep work or plugging in their equipment. With the new Contractor
summarizeCurrently, the contractor's utilize their trailers as a power source for activities such as prep work or plugging in their equipment. With the new Contractor Facility layout, the contractor's trailers will be further away from their laydown areas, which will impede their access to a power source. Originally, there were two optional welding receptacles designed as part of the project for $22,115.00, but they were cut from the project in 2021 in order to save money. My idea to solve this issue was to install the optional welding receptacle, but switch the receptacle to a 120V panel to connect to. Since the trailer & light conduits have already been installed (excavated, placed, buried, and poured in concrete), this option is no longer feasible and will be more expensive than the price presented in the table below
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
