Question: sumptions. Use the information 1. A cost engineer estimated the total equipment bare module cost of a plant in $100,000,000. In the report the engineer

 sumptions. Use the information 1. A cost engineer estimated the total

sumptions. Use the information 1. A cost engineer estimated the total equipment bare module cost of a plant in $100,000,000. In the report the engineer forgot to include a floating shell and tube heat exchanger of stainless steel. The heat exchanger has an area of 100m and operates at 100 barg pressure in each side. Estimate the total grass root cost in Wi/2021 (CEPCI=730) for the project including this heat exchanger. (30 pts)

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Chemical Engineering Questions!