Question: Suppose a power system which operates three generators to serve its load (800 MW in total) Generators Cost Curve P max P min Unit 1

Suppose a power system which operates three generators to serve its load (800 MW in total)

Generators

Cost Curve

Pmax

+Td7AqXdeMuZezCGAAAAAElFTkSuQmCC

Pmin

nCdqPRO8atSVqAAAAAElFTkSuQmCC

Unit 1

P1=101+7.5P1+0.025P12

0EEQAAAABJRU5ErkJggg==

300MW

150MW

Unit 2

P2=31+11P2+0.05P22

2v2P0bofIMfT0NbjMAAAAASUVORK5CYII=

300MW

200MW

Unit 3

P3=78+2.0P3+0.05P32

wGHOZUcK7qfvAAAAABJRU5ErkJggg==

400MW

100MW

1. What is the goal of economic dispatch? Formulate it mathematically. Explicitly represent the objective and constraints.

2. Why and under what situation does the economic dispatch model the decision making process of the generators in response to the price?

3. Neglect any operational limits of each generator and find the generation amount for each generator and Lagrange multiplier. What does Langrange multiplier indicate?

4. If he operating limits of the power system are binding, what would happen to the power system operation?
 
 
 
 
 

max

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock

Financial dispatch is a basic part of force framework activity that plans to decide the ideal age levels for every generator to fulfil the heap need while limiting the complete age cost Here are the s... View full answer

blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Operating System Questions!