Question: suppose a very simple scheduling network has only two entirely parallel paths ( no shared edges ) from the start of the process to the

suppose a very simple scheduling network has only two entirely parallel paths
(
no shared edges
)
from the start of the process to the end.Femurrther suppose the shorter of the paths takes a cumulative
60
seconds to complete and the longer path takes
90
seconds to complete.If an edge in the shorter path is increased by
45
seconds,how long will the operation take in total?
(
Assume each of the teo parallel parhs have entirely squential steps from the beginning to the end,and two processors
/