Question: Suppose that using the centroid method you found the best location for a communications tower. The location happe be in the middle of a pond.

Suppose that using the centroid method you found the best location for a communications tower. The location happe be in the middle of a pond. Then, you should locate the tower
a. at the closest point outside the pond.
b. after considering qualitative factors such as geography, roads and utilities to help find the exact location.
c. at that location using water proof concrete and precast poles.
d. None of these
e. using some other method.
Which of the following is an input to the master production schedule?
a. None of these.
b. Planned-order schedules.
c. Exception reports.
d. Bill of materials (BOM) file.
e. Inventory records file.
hich of the following is not considered a major work flow structure?
a. Project.
Workcenter
 Suppose that using the centroid method you found the best location

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!