Question: Suppose that using the centroid method you found the best location for a communications tower. The location happe be in the middle of a pond.
Suppose that using the centroid method you found the best location for a communications tower. The location happe be in the middle of a pond. Then, you should locate the tower
a at the closest point outside the pond.
b after considering qualitative factors such as geography, roads and utilities to help find the exact location.
c at that location using water proof concrete and precast poles.
d None of these
e using some other method.
Which of the following is an input to the master production schedule?
a None of these.
b Plannedorder schedules.
c Exception reports.
d Bill of materials BOM file.
e Inventory records file.
hich of the following is not considered a major work flow structure?
a Project.
Workcenter
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock