Question: Suppose that when a process is in control a variable can be taken to be normally distributed with a mean of 0 = 1 0
Suppose that when a process is in control a variable can be taken to be normally distributed with a mean of and a standard deviation of sigma and that a control chart is to be implemented by plotting the average of n observations at each time point.
a What are the center line and control limits of a sigma control chart that you would construct to monitor this process?
b If a sample average x is obtained, should the process be declared to be out of control? What if x
c If the process moves out of control so that the variable mean becomes with sigma what is the probability that an observation lies outside the control limits What is the average run length for detecting this change?
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
