Sweeten Company had no jobs in progress at the beginning of the year and no beginning...
Fantastic news! We've Found the answer you've been seeking!
Question:
Transcribed Image Text:
Sweeten Company had no jobs in progress at the beginning of the year and no beginning inventories. It started, completed, and sold only two jobs during the year-Job P and Job Q. The company uses a plantwide predetermined overhead rate based on machine-hours. At the beginning of the year, it estimated that 4,000 machine-hours would be required for the period's estimated level of production. Sweeten also estimated $31,000 of fixed manufacturing overhead cost for the coming period and variable manufacturing overhead of $3.20 per machine-hour. Because Sweeten has two manufacturing departments-Molding and Fabrication-it is considering replacing its plantwide overhead rate with departmental rates that would also be based on machine-hours. The company gathered the following additional information to enable calculating departmental overhead rates: Estimated total machine-hours used Estimated total fixed manufacturing overhead Molding 2,500 Fabrication 1,500 Estimated variable manufacturing overhead per machine-hour $ 13,750 $ 2.90 $ 17,250 $ 3.70 Total 4,000 $ 31,000 The direct materials cost, direct labor cost, and machine-hours used for Jobs P and Q are as follows: Direct materials Direct labor cost Actual machine-hours used: Fabrication Molding Total Job P $ 28,000 Job Q $ 15,500 $ 33,000 $ 13,500 3,200 2,300 2,100 5,300 2,400 4,700 Sweeten Company had no overapplied or underapplied manufacturing overhead costs during the year. Required: For questions 1-8, assume that Sweeten Company uses a plantwide predetermined overhead rate with machine-hours as the allocation base. For questions, 9-15, assume that the company uses predetermined departmental overhead rates with machine-hours as the allocation base in both departments. 3. What is the total manufacturing cost assigned to Job P? Note: Do not round intermediate calculations. Round your final answer to nearest whole dollar. Total manufacturing cost Sweeten Company had no jobs in progress at the beginning of the year and no beginning inventories. It started, completed, and sold only two jobs during the year-Job P and Job Q. The company uses a plantwide predetermined overhead rate based on machine-hours. At the beginning of the year, it estimated that 4,000 machine-hours would be required for the period's estimated level of production. Sweeten also estimated $31,000 of fixed manufacturing overhead cost for the coming period and variable manufacturing overhead of $3.20 per machine-hour. Because Sweeten has two manufacturing departments-Molding and Fabrication-it is considering replacing its plantwide overhead rate with departmental rates that would also be based on machine-hours. The company gathered the following additional information to enable calculating departmental overhead rates: Estimated total machine-hours used Estimated total fixed manufacturing overhead Molding 2,500 Fabrication 1,500 Estimated variable manufacturing overhead per machine-hour $ 13,750 $ 2.90 $ 17,250 $ 3.70 Total 4,000 $ 31,000 The direct materials cost, direct labor cost, and machine-hours used for Jobs P and Q are as follows: Direct materials Direct labor cost Actual machine-hours used: Fabrication Molding Total Job P $ 28,000 Job Q $ 15,500 $ 33,000 $ 13,500 3,200 2,300 2,100 5,300 2,400 4,700 Sweeten Company had no overapplied or underapplied manufacturing overhead costs during the year. Required: For questions 1-8, assume that Sweeten Company uses a plantwide predetermined overhead rate with machine-hours as the allocation base. For questions, 9-15, assume that the company uses predetermined departmental overhead rates with machine-hours as the allocation base in both departments. 3. What is the total manufacturing cost assigned to Job P? Note: Do not round intermediate calculations. Round your final answer to nearest whole dollar. Total manufacturing cost
Expert Answer:
Answer rating: 100% (QA)
1 Calculate the plantwide predetermined overhead rate Total Estimated Overhead Fixed Manufa... View the full answer
Related Book For
Introduction to Managerial Accounting
ISBN: 978-1259917066
8th edition
Authors: Peter C. Brewer, Ray H Garrison, Eric Noreen
Posted Date:
Students also viewed these accounting questions
-
Dr. Umburgh noticed that the $100.00 check made to Trenton Medical Supplies has not cleared for four months. What type of check is the outstanding check referred to as?
-
1957 ford Original Cost is 32k. FMV at Conversion is $32k. Using MACRS Rates- Half Year Convention. What is the basis for depreciation and Year 1 Depreciation amount and what is the appropriate...
-
The compound bow in the previous problem requires 152 J of work to draw the string back to x = 0.540 m, at which point the archer need only exert 250 N of force to hold the string in place. (a)...
-
Suppose that we wish to assess whether more than 60 percent of all United Kingdom households spent on life insurance in 1993. That is, we wish to assess whether the proportion, p, of all United...
-
Write an exponential function showing the relationship between y and t. At the beginning of an environmental study, a forest covered an area of 1500 km. Since then, this area has decreased by 3.25%...
-
Comparative data extracted from the general purpose financial statements and notes thereto of Express Delivery Ltd are presented below. Required (a) Prepare a trend analysis of the data. (b) Comment...
-
The Jean- Pierre Amor Company manufactures two lines of designer yard gates, called model A and model B. Every gate requires blending a certain amount of steel and zinc; the company has available a...
-
develop an FTE variance reporting document that will be used for department managers to explain variances in FTE utilization compared to benchmarks. Make sure to address how and when managers will be...
-
Below are the results of an auction for an IPO of Bro's, a trendy coffee shop chain. Bro's is offering 50 million shares. Bidder Bid price Number of shares A 50.25 15 million 20 million 20 million C...
-
An IV of 1200mL is scheduled to run to completion at a rate of 40gtt/min using a 20gtt/ml set. After 6 hours 640mL have infused. Calculate the new rate in gtt/min so that the iv completes on time
-
Complete the loan inputs tables, and then the loan amortization schedule for a car loan of $34,000.00 that will be repaid over 72 months, and an interest rate of 8.25%
-
If you had excavated and removed all soils from the top of a rock formation, and now had excavated to reveal a face of solid rock, would you have to slope the face, or is it considered solid rock?
-
Find a particular solution to in a > 0. Yp= dy dy +8x dx da +12y = x sin(x).
-
Inventories Work in process Materials Finished goods Accounts payable Accounts receivable Beginning 15,000 24,000 31,000 Advertising expense Depreciation of factory equipment Depreciation of office...
-
Discuss the key elements of positive and proactive communications that are missing in the following workplace scenarios and any other aspects of the situation you feel need to be corrected (and why)....
-
Why can wastewater treatment requirements in Hawaii be less stringent than those in most locations on the U.S. mainland?
-
Using a search engine such as Google, search for power of a hypothesis test. Describe what the power of a hypothesis test is.
-
H 0 : The lottery is fair. Ha: The lottery is biased. Without using the terms null hypothesis and alternative hypothesis, identify the type I error and identify the type II error.
-
What do p, p, and P-value represent?
Study smarter with the SolutionInn App