Question: T. Smunt Manufacturing Corp. has the process displayed below. The drilling operation occurs separately from and simultaneously with the sawing and sanding operations. The product

T. Smunt Manufacturing Corp. has the process displayed below. The drilling operation occurs separately from and simultaneously with the sawing and sanding operations. The product only needs to go through one of the three assembly operations (the assembly operations are parallel and identical). (1) Which operation is the bottleneck? What is the system time? (2) If the firm operates 8 hours per day, 20 days per month, what is the monthly capacity of the manufacturing process? (1) Which operation is the bottleneck? What is the system time? (2) If the firm operates 8 hours per day, 20 days per month, what is the monthly capacity of the manufacturing process? (3) What is the process cycle time? (4) Suppose that a second drilling machine is added with exact the same station processing time ( 27min/unit ). Which operation is the new bottleneck? What is the new system time? What is the new process cycle time
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
