Question: Table 1: Look at Table 1 in the Tables and Figures document. Banana Corp manufactures tablets in an assembly line. The tasks needed to manufacture





Table 1: Look at Table 1 in the "Tables and Figures" document. Banana Corp manufactures tablets in an assembly line. The tasks needed to manufacture the tablet are presented in Table 1. The company wants to make 48 tablets per 8 hour shift. What is the required cycle time? 10 mins/unit 4.8mins/unit 16 mins/unit 48 mins/unit Look at Table 1 in the "Tables and Figures" document. Banana Corp manufactures tablets in an assembly line. The tasks needed to manufacture the tablet are presented in Table 1. The company wants to make 48 tablets per 8 hour shift. What is the theoretical minimum number of workstations needed? 6 2 4 8 Question 3: Look at Figure 2 in the "Tables and Figures" document. An automotive manufacturer implemented line balancing to change from system 1 to system 2 in Figure 2. Which system has a longer flow time? Both systems have the same flow time. System 2 System 1 Look at Figure 2 in the "Tables and Figures" document. An automotive manufacturer implemented line balancing to change from system 1 to system 2 in Figure 2. Which system has a higher capacity? System 2 System 1 Both systems have the same capacity
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
