Question: Table 1 . Parameter Quantity Ore demand 1 0 , 0 0 0 tonnes / shift Stripping requirement 4 0 , 0 0 0 m
Table
Parameter
Quantity
Ore demand
tonnesshift
Stripping requirement
m shift
Shovel loading time
minutes
Backhoe loading time
minutes
Average velocity of loaded truck
ms
Average velocity of empty truck
ms
Distance to and from waste disposal site
m and m respectively
Haulage distance to stockpile
km
Truck Capacity
m
Truck discharge time
seconds
Truck waiting time
seconds.
Equipment utilisation
Density of ore
tonnes m
Truck delay time
secs
Work Schedule
Two hours shiftsday six days per week
what is the stripping ratio and recovery