Question: Table 6.10 lists the sequence of machine types required for nine part types and also shows the annual volume of production for each.A part machine
Table 6.10 lists the sequence of machine types required for nine part types and also shows the annual volume of production for each.A part machine matrix is given for this data.
Assuming the transfer batch size for part types 1?4 is 30, part types 5?8 is 15, and part type 9 is 10, determine the frequency of trips matrix using the given part machine matrix


TABLE 6.10 Part Routing and Volume Information for Exercise 7 Part Type Number Sequence of Machine Types Visited 3,5,2 3,5 4, 6, 1 1,4 6,4 1,6 2,5, 3 5,3 6, 1, 4 1 689 G A WN. 2 3 4 5 Production Volume 3000 1000 8550 2750 9000 500 300 3600 4110 123 + 2 3 4 Part 5 6 7 8 9 1 1 1 1 1 2 1 Machine 3 4 5 6 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Step by Step Solution
3.64 Rating (147 Votes )
There are 3 Steps involved in it
To determine the frequency of trips matrix follow these steps StepbyStep Solution 1 Identify Part Ty... View full answer