Question: . Table below is a time-phased net requirements for Widgets over the next six weeks along with the capacity constraint. Week 1 2 3 4
Table below is a time-phased net requirements for Widgets over the next six weeks along with the capacity constraint. Week 1 2 3 4 5 6 Requirements 335 200 Capacity 600 600 140 440 300 600 200 400 200 200 The setup cost is $200 and the holding cost is $0.30 per unit per week. Accounting for the capacity constraint, the modified requirements schedule, without improvement step, is: Note: Enter your answer as integer. Week Requirement, r' 1 2 3 5