Question: table [ [ , table [ [ ] , [ Storage ] ] , Processing, table [ [ Quality ] , [

\table[[,\table[[],[Storage]],Processing,\table[[Quality],[Control],[(QC)]],\table[[],[Shipping]],\table[[Administrative],[Offices]]],[\table[[Quality Control],[(QC)]],50,450,-,400,0],[\table[[],[Shipping]],0,300,400,-,5],[\table[[Administrative],[Offices]],0,10,0,5,-]]
Assignment Tasks
Material Flow Analysis:
Calculate the total daily material handling cost for each layout option provided below.
Identify inefficiencies in terms of material movement and suggest improvements.
Evaluate Proposed Layouts: The company has shortlisted two potential layouts:
Layout A:
Receiving & Storage and Processing are adjacent.
Quality Control is located farthest from Packaging & Shipping.
Administrative Offices are placed near the Processing Area.
Layout B:
Receiving & Storage is centrally located.
Quality Control is adjacent to both Processing and Packaging & Shipping.
Administrative Offices are placed farthest from production areas.
Evaluate the layouts based on material handling costs and operational efficiency. Include a sketch or diagram for better visualization.
3. Design an Improved Layout:
Using the data provided, propose an optimized layout.
Justify your design decisions based on space requirements, material flow, and cost-efficiency.
Include a diagram or schematic of your proposed layout.
Recommendations:
Summarize your findings and recommend the best layout for SmartGears Manufacturing.
Include any additional considerations (e.g., future scalability, employee workflow).Case Study: Designing an Optimal Layout for a Manufacturing Plant
Background:
You are a layout consultant hired by SmartGears Manufacturing, a company producing highprecision gear systems for the automotive industry. The company plans to establish a new manufacturing facility with a total available space of 20,000 square meters. The goal is to design a layout that minimizes material handling costs and optimizes production efficiency.
The plant must include the following areas:
Receiving and Storage Area
Processing Area (Machinery and Workstations)
Quality Control (QC) Area
Packaging and Shipping Area
Administrative Offices
Each area has specific space requirements and material flow interactions with other areas, as described below.
Space Requirements:
\table[[Area,Required Space (sq. meters),Notes],[Receiving & Storage,5,000,Must be located close to the Processing Area.],[Processing,10,000,Central to all operations.],[Quality Control (QC),2,000,Located between Processing and Packaging.],[Packaging & Shipping,2,000,Close to QC and exit points.],[Administrative Offices,1,000,Should have minimal interaction with other areas.]]
Material Flow Matrix:
The material handling cost is $2 per meter moved per unit. The table below shows the daily material flow (in units) between areas:
\table[[,\table[[],[Storage]],Processing,\table[[Quality],[Control],[(QC)]],\table[[],[Shipping]],\table[[Administrative],[Offices]]],[\table[[],[Storage]],-,500,50,0,0],[Processing,500,-,450,300,10]]
 \table[[,\table[[],[Storage]],Processing,\table[[Quality],[Control],[(QC)]],\table[[],[Shipping]],\table[[Administrative],[Offices]]],[\table[[Quality Control],[(QC)]],50,450,-,400,0],[\table[[],[Shipping]],0,300,400,-,5],[\table[[Administrative],[Offices]],0,10,0,5,-]] Assignment Tasks Material Flow Analysis: Calculate the total daily

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!