Question: table [ [ , table [ [ ] , [ Storage ] ] , Processing, table [ [ Quality ] , [
tabletableStorageProcessing,tableQualityControlQCtableShippingtableAdministrativeOfficestableQuality ControlQCtableShippingtableAdministrativeOffices
Assignment Tasks
Material Flow Analysis:
Calculate the total daily material handling cost for each layout option provided below.
Identify inefficiencies in terms of material movement and suggest improvements.
Evaluate Proposed Layouts: The company has shortlisted two potential layouts:
Layout A:
Receiving & Storage and Processing are adjacent.
Quality Control is located farthest from Packaging & Shipping.
Administrative Offices are placed near the Processing Area.
Layout B:
Receiving & Storage is centrally located.
Quality Control is adjacent to both Processing and Packaging & Shipping.
Administrative Offices are placed farthest from production areas.
Evaluate the layouts based on material handling costs and operational efficiency. Include a sketch or diagram for better visualization.
Design an Improved Layout:
Using the data provided, propose an optimized layout.
Justify your design decisions based on space requirements, material flow, and costefficiency.
Include a diagram or schematic of your proposed layout.
Recommendations:
Summarize your findings and recommend the best layout for SmartGears Manufacturing.
Include any additional considerations eg future scalability, employee workflowCase Study: Designing an Optimal Layout for a Manufacturing Plant
Background:
You are a layout consultant hired by SmartGears Manufacturing, a company producing highprecision gear systems for the automotive industry. The company plans to establish a new manufacturing facility with a total available space of square meters. The goal is to design a layout that minimizes material handling costs and optimizes production efficiency.
The plant must include the following areas:
Receiving and Storage Area
Processing Area Machinery and Workstations
Quality Control QC Area
Packaging and Shipping Area
Administrative Offices
Each area has specific space requirements and material flow interactions with other areas, as described below.
Space Requirements:
tableAreaRequired Space sq metersNotesReceiving & Storage,Must be located close to the Processing Area.ProcessingCentral to all operations.Quality Control QCLocated between Processing and Packaging.Packaging & Shipping,Close to QC and exit points.Administrative Offices,Should have minimal interaction with other areas.
Material Flow Matrix:
The material handling cost is $ per meter moved per unit. The table below shows the daily material flow in units between areas:
tabletableStorageProcessing,tableQualityControlQCtableShippingtableAdministrativeOfficestableStorageProcessing
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock