Question: Task 1 Consider the following cell configuration: Me Work Sequence Name of Operation HEW Human Walk Machining time, time, time, seconds seconds seconds Mill ends

Task 1 Consider the following cell configuration:

Task 1 Consider the following cell configuration: Me Work Sequence Name of Operation HEW Human Walk Machining time, time, time, seconds seconds seconds Mill ends HMI SI HM2 Drill hole DP (3B Turn, borell or L2 DP b 2 UST Shaft Cell Mill Alats HM2 COM Mill steps VM dl VM Final inspection 10 HMI 80 30 280 Finished parts Final inspection M - Machining time H-Human time - load, unload, check part C-Cycle time = 80 + 30 - 110 seconds Longest machining time - 180 seconds Total machining time - 280 seconds Key: DP Drill press L = Lathe HM - Horizontal milling machine VM - Vertical milling machine + Material flow Operator's path Operation sequence 5 Walk away switch All machines in the cell are capable of processing unattended while the operator(s) are doing manual operations (load, unload, inspect, and deburr) and walking from machine to machine. The time to change tools and workholders (perform setup) is not shown. Design rule: M, ii

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!