Question: Task: 1. Consider two products, P1 and P2, which need to be produced by three subsequent operations on machines M1, M2, M3. Processing times are

Task:

1. Consider two products, P1 and P2, which need to be produced by three subsequent operations on machines M1, M2, M3. Processing times are given in the table:

Task: 1. Consider two products, P1 and P2, which

a) Calculate lead time for each product individually for the production of the whole batch if part transfer is serial.

b) Calculate lead time for each product individually for the production of whole batch if part transfer is parallel.

c) Calculate lead time for each product individually for the production of whole batch if part transfer is combined.

d) Compare those three methods of part transfer for each product: which generates the longest and which generates the shortest lead time. What is the ratio between the longest and the shortest method and why? Do this analysis for both products.

e) Compare ratios from d) between two products. Are they similar or close? Why?

parts quantity parts quantity

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!