Question: Task: 1 . Data Collection: Use the provided concrete compressive strength data for four weeks. Week 1 : { 3 2 . 1 , 3

Task:
1. Data Collection:
Use the provided concrete compressive strength data for four weeks.
Week 1: {32.1,32.5,31.8,33.2,32.0,32.7,31.5,32.3,32.9,32.1}
Week 2: {31.9,32.3,32.7,33.0,32.4,32.8,31.6,32.2,33.1,32.0}
Week 3: {32.2,32.6,31.7,32.9,32.3,31.5,32.8,32.1,31.9,33.0}
Week 4: {32.5,31.8,32.3,32.7,32.0,33.2,31.6,32.9,32.1,32.4}
2. Calculations:
Calculate the average and standard deviation for each week's data.
3. Control Chart Creation:
Use Excel to create a control chart.
Include the following elements:
Data points for each week.
Centerline (CL) representing the average compressive strength
Upper Control Limit (UCL) and Lower Control Limit (LCL) calculated using
CL=x\pm 3s
4. Analysis:
Analyze the control chart to identify any points beyond the control limits.
Look for patterns or trends in the data.
5. Submission:
Submit the control chart and analysis report on Canvas.
Note: use a significance level of 0.05, and therefore, the critical z-value for a two-tailed test should
be taken from Cumulative Standard Normal Distribution Table given in previous lecture.

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!