Question: Task 2 - Installing bathroom vanity unit Project Brief and Design Documentation Objective: Design and install vanity unit in a bathroom to optimize space usage,

Task 2 - Installing bathroom vanity unit

Project Brief and Design Documentation

Objective:

Design and install vanity unit in a bathroom to optimize space usage, enhance functionality, and improve aesthetics.

Client Profile:

Client Name:Jeff Thompson

Household: Couple with one teenage child

Lifestyle: Family enjoys a relaxed lifestyle with an emphasis on self-care and wellness. They appreciate a bathroom space that offers both functionality and a spa-like atmosphere for unwinding after busy days.

Design Preferences:

  • Style - Modern, minimalistic design
  • Colour Scheme - Matte white with stainless steel accents
  • Lighting - Bright LED lighting
  • Fixtures - Dual high-arc chrome mixer taps

Special Requirements: Ample, organized storage with drawers and dividers

Design Documentation:

  1. Specifications and Measurements
  • Vanity dimensions - 137 cm (length) x 59 cm (height).
  • Sink dimensions - 49.5 cm (length) x 30.5 cm (width), with a depth of 11.5 cm.
  • Materials - Engineered wood with a moisture-resistant finish.
  • Colour - Matte white with stainless steel handles.
  • Faucets - Dual high-arc, mixer taps in chrome finish.
  1. Design considerations
  • Lighting - Installation of overhead LED lighting to enhance visibility and complement the vanity's modern design.
  • Mirror - Placement of a large, frameless mirror above the vanity, spanning its full length (137 cm) to enhance light reflection and sense of space.
  • Storage - Integration of spacious drawers with dividers for organized storage of toiletries and bathroom supplies.
  1. Compliance and Safety
  • Building Codes - Compliance with the Building Code of Australia, ensuring all materials and installations meet moisture resistance and durability requirements.
  • Water Efficiency - Use of water-efficient faucets to comply with WELS standards.
  • Electrical Safety - All electrical fittings for lighting to comply with Australian standards for bathroom safety.
  1. Installation Plan

Preparation:

Removal of the existing vanity unit, assessment of wall and floor integrity, and evaluation of current plumbing configurations.

Installation Sequence:

  • Ensuring structural support is adequate for the new vanity.
  • Installation of plumbing fixtures followed by the vanity cabinet.
  • Securing the sink and faucets, followed by the connection of water supply and waste lines.
  • Installation of the mirror and lighting fixtures.

Coordination:

Coordination with plumbers and electricians to ensure all fittings and services are installed according to specifications and compliance standards.

Appendix E - Materials List - Task 2

Item No.DescriptionMaterialQuantitySpecificationsNotes

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Mathematics Questions!