Question: Task 3 . Retaining walls are often found in places where extra support is needed to prevent the earth from moving downhill. In this case,
Task Retaining walls are often found in places where extra support is needed to prevent
the earth from moving downhill. In this case, excavation before putting the retaining wall
can cause cracks in the surrounding properties due to soil settlement or land sliding that can
even cause structural collapse. Your company has been awarded a Design& Build contract
for a midrise building project. As a civil technician, you are expected to understand the
design and construction details handed over by the design engineer. A geotechnical report
was given to the design engineer for hisher analysis. The design engineer designed two
retaining wall systems along the boundaries. The highlighted area of the site was
determined for a meter excavation. The site location shows the northern, eastern, and
western boundaries which are and meters, respectively. Consider the followings
for the cost:
The prefabricated concrete: $ per cubic meter
The reinforcement: $ per kg
The total formwork activities: $
As the civil technician, you are appointed to propose the costeffective design.
System Screw piles
The system includes meter piles, capping beam, and grout injection in between the piles.
The section area of the capping beam is mm X mm and its required reinforcement
cage weighs kg per meter of the cage. The interval of piles on the eastern is meters cl
to cl and on the northern and western boundaries is meters cl to cl Each pile cost
$ and the grout injection requires kg fine cement per square meter for the wall.
The grout work contractor quoted $ per kg including materials to complete the job per
square meter of the boundaries faces. The photos of system shows the endproduct and
the site location.
Provide your answer in the table shown in the answer sheet
Bill of Quantity Screw piles
Sr No Items Unit Quantity Total
Quantity
Rate Amount
Total
System secant pile system
This system includes meter piles with a diameter of mm a capping beam mm
height and mm width and its required reinforcement cage weighing kg per meter. The
concrete piles are to be constructed next to each other with mm intervals, maximum.
Provide your answer in the table shown in the answer sheet
Bill of Quantity Secant piles
Sr No Items Unit Quantity Total Quantity Rate Amount
Total
Task Explain the main stages to implement this project and determine the activities to be
taken at each stage. write down the main stages to implement points per each stage
desk studybrain storming
site evaluation reconnaissance
Site preparation
Mobilization
construction
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock