Question: Task 3. You will need to estimate and cost a job for the below spesifications. Swayze Construction Co. recently built a new bathroom as an
Task 3. You will need to estimate and cost a job for the below spesifications. Swayze Construction Co. recently built a new bathroom as an extension to an already existing bungalow. These are the specifications and features of the new bathroom: The foundation slabs cover an area of 12 m2 A total of 20 m of pipes were installed as part of the bathroom's plumbing. There are eight new pieces of sanitary ware in the bathroom: One toilet Two washbasins Two sink taps Two shower taps One shower outlet The floor area of the bathroom is 9 m2. All of the bathroom floors are tiled. The bathroom has four walls. Each wall is 3 m wide and 3 m tall. Only half the height of the wall is tiled. Laying the slabs cost $3,000.00. This includes labour and materials. Installing the pipes cost $6,000.00. This includes labour and materials. Installing all the sanitary ware cost $18,000.00. This includes labour and materials. Tiling the tiled sections of the bathroom (i.e. all of the bathroom floor and half the height of each wall) cost $1,000.00. This includes labour and materials. Given the information above, calculate for the following: Cost of laying the slabs per square metre. Cost of installing the pipes per square metre. Cost of installing sanitary ware per unit. Cost of tiling per square metre. You must show the calculations to your answers. Round up your answers to the nearest dollar. You can provide your answer by in the answer box provided and/or upload a google sheet or excel spread
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
