Question: Task: Fill up the form using the following information provided. If you do not find enough information provided to fill up the form, then make
Task:
Fill up the form using the following information provided. If you do not find enough information provided to fill up the form, then make reasonable assumptions to complete it
Information for the Project Charter:
Lets imagine a construction firm thats going through the initiation phase of a residential
construction project, more specifically an apartment complex.
Project Information
Company: Acme Construction Co
Project Name: Luxury Apartments at York
Project Description: The project consists of the construction of a luxury apartment
complex, featuring three types of floor plans going from to square feet
Roles & Responsibilities
Lead Architect: Helena Johnson
Lead Engineer: Samuel Weiss
Construction Project Manager: Frederick Terry
Cost Estimator: Danielle DuPont
Project Administrator: Luke Robinson
Site Supervisor: David Rosenthal
Project Vision and Objectives
Project Vision: Completion on time, within budget, to exploit housing needs in the area.
Project Objectives:
Hire construction crew members as needed,
Procure any materials or equipment as needed,
Transport materials and equipment to the construction site as instructed by the
construction project manager and site supervisor,
Fill out daily construction reports to monitor the performance of the construction team.
Business Case
The district is ripe for housing. Recent mixeduse construction has produced popular retail and restaurants. The area is lacking in luxury residential housing for the moneyed class which has increasingly made this part of the city a destination. Attached is supporting research, demographics, etc.
Project Scope
The construction project will be built as per the construction drawings, specifications and
other documents such as the construction plan and construction schedule.
Project Timeline
The project is expected to start by the last quarter of the year and be completed between months.
Hint: Use the table to distribute the timeline in a reasonable way.
Project Budget
The project budget is $ million, based on the number of units and their square footage, as specified in the construction drawings, architectural designs and computerassisted designs CAD models. The project budgeting process was completed thanks to a crossfunctional effort by the architecture, engineering and cost estimation team.
Hint: Use the table to distribute the timeline in a reasonable way.
Project Assumptions
Its assumed that no act of God such as earthquakes, tornados or hurricanes will
cause the project to stop.
Its assumed that the equipment will be in optimal condition so that the construction phase will be completed normally.
Its assumed that there are enough construction crew employees to complete the
project.
Its assumed that construction subcontractors will complete their work on time.
Project Constraints
The project shall not take longer than months. If the construction team is running
behind schedule, additional subcontractors might be hired without exceeding the
project budget.
The project has a budget of $ million that must be monitored by the construction
project manager. This project budget already contemplates a contingency fund in
case there are overcosts, so it should not be exceeded for any reason.
Project Risks
The following risks might affect this project:
Unexpected increases in material costs
Unavailability of project resources such as labor, materials and equipment due to
external factors
Damage or theft of company equipment
Natural disasters
Project Requirements and Success Criteria
The quality, safety standards, success criteria and other requirements for this project are explained in the construction drawings and construction specification documents. These include but are not limited to the quality of materials, skills required from the construction crew, environmental compliance standards and building codes.
PROJECT CHARTER : GENERAL PROJECT INFORMATION:
PROJECT NAME:
PROJECT MANAGER:
PROJECT SPONSOR:
GREEN BELTS ASSIGNED:
EXPECTED START DATE:
EXPECTED COMPLETION DATE:
BLACK BELTS ASSIGNED:
EXPECTED SAVINGS:
ESTIMATED COSTS:
PROJECT OVERVIEW
PROBLEMOR ISSUE:
PURPOSE OF PROJECT:
BUSINESS CASE:
GOALS METRICS:
EXPECTED DELIVERABLES:
PROJECT SCOPE
WITHIN SCOPE:
OUTSIDE OF SCOPE:
TENTATIVE SCHEDULE
KEY MILESTONE:
Form Project TeamPreliminary Review Scope:START TO FINISH DATE?
Finalize Project Plan Charter Kick Off: START TO FINISH DATE?
Define Phase: START TO FINISH DATE?
Measurement Phase: START TO FINISH DATE?
Analysis Phase: START TO FINISH DATE?
Improvement Phase: START TO FINISH DATE?
Control Phase: START TO FINISH DATE?
Project Summary Report and Close Out: START TO FINISH DATE?
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock