Question: TASK: Take off and bill the quantities for the settlement tank as shown in Fig. 1 . ( overleaf ) General Notes Calculations must be
TASK:
Take off and bill the quantities for the settlement tank as shown in Fig. overleaf
General Notes
Calculations must be done, using the standardised approach, in accordance with the
CESMM measurement definition and coverage rules.
ei descriptions must include any additional requirements specified in CESMM and must
be sufficiently detailed to permit unambiguous pricing of each item.
Notes
a Original ground level is equal to finished ground level as shown;
b All structural concrete is to be underlaid by mm blinding C with mm
aggregate
c Formwork shall be roughfinish to the outside of the structure and fairfinish to the
inside of the structure;
d Engineering brickwork is to be used for all vertical walls;
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock