Question: Tasks on an assembly line are assigned to 2 workstations as shown below. If the required cycle time is 1 0 0 seconds, what is

Tasks on an assembly line are assigned to 2 workstations as shown below. If the required cycle time is 100 seconds, what is the efficiency of the assembly line? (slide 39)
Workstation 1
Task(s) Assigned Time (sec)
Task B
30
Task E
60
Workstation 2
\table[[Task(s) Assigned,Time (sec)],[Task C,10],[Task A,40],[Task D,20]]
90%