Question: TB MC Qu . 1 0 - 6 8 A plot below the lower control limit on the . . . A plot below the
TB MC Qu A plot below the lower control limit on the
A plot below the lower control limit on the range chart
I should be ignored since lower variation is desirable.
II may be an indication that process variation has decreased.
III should be investigated for assignable cause.
Multiple Choice
II and III
I, II and III
II only
Step by Step Solution