Question: Template 1: Plan and to construct eaves. Plan and to construct eaves. Client Name: STC Address: 16 Lotus St, Woolloongabba QLD 4102 Phone Number: 07)3891
Template 1: Plan and to construct eaves.
| Plan and to construct eaves. | ||
| Client Name: STC Address: 16 Lotus St, Woolloongabba QLD 4102 Phone Number: 07)3891 3282 Date(dd/mm/yyyy) Worker name: | Job Details: Plan for carry out setting out Worker signature: | |
Work instructions | ||
| Work sequence toconstruct eaves | ||
| WHS requirements toconstruct eaves | ||
Two (2) Australian Standards to befollowed. | |
| Requirements ofCommonwealth and state or territorylegislation | |
| Requirements andobligations underEnvironmentalplans. | |
| Manufacturers' specifications for tools and equipment to be used | |
| Workplace requirements |
Dimensions from drawings | ||
Material specifications | ||
PPE required | ||
Tools and equipment selected | ||
Tools and equipment | Checked for serviceability | Any faults (if any) |
Faults reported to: | ||
Material requirements for: | ||
Work to be completed | Maetrials required | Quantity requirements |
Construct timber verge gable eaves | ||
Construct timber boxed gable eaves | ||
Construct timber boxed eaves | ||
Construct timber raked eaves | ||
Construct timber steel fascia with hangers | ||
| Safe handling procedures implemented to position materials | ||
| Sign off: Date: |
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
