Question: The activities needed to build a prototype laser scanning machine at Dave Fletcher Corp. are listed in the following table. a) Construct an ADN network
The activities needed to build a prototype laser scanning machine at Dave Fletcher Corp. are listed in the following table. a) Construct an ADN network for these activities (3 points) b) Determine the ES, EF, LS, and LF for each activity? (Fill in the table) (6 point) c) Determine the slacks for each activity (fill in the table) (2 points) d) What is the critical path? (2 point)