Question: The AOA network along with the duration days is given below. Activity Duration a 7 b 5 c 4 d 2 e 4 f 8

The AOA network along with the duration days is given below. Activity Duration a 7 b 5 c 4 d 2 e 4 f 8 g 3 h 5