Question: The contractor is entitled to rely on construction documents provided by the owner ( prepared by the designers ) to be sufficient for their intended
The contractor is entitled to rely on construction documents provided by the owner prepared by the designers to be sufficient for their intended purpose. Therefore, the contractor is not responsible for defects in the contract documents. This is known as:
a Professional standard of care
b Professional negligence
c Errors and omissions
d Spearin Doctrine
The party responsible for assuring that the building is designed in accordance with building codes and regulations is the:
a Owner
b Designer
c Contractor
d All of the above
A review of the design to determine if it is practical to construct with the means, methods, and materials available within the owner's budget and schedule is called:
a Sustainability review
b Feasibility study
c Quality review
d Constructability review
Database software which links graphic and nongraphic information and is used to produce construction drawings is called:
a D Cad
b d Cad
c Rendering Software
d BIM
Questions refer to AIA Document B Standard Form of Agreement Between Owner and Architect.
What Article describes the Scope of the architect's services?
a Article
b Article
c Article
d Article
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
