Question: + The difference between the upper specification and the lower specification for a process is 0.50. The standard deviation is 0.10. Based on the given

+ The difference between the upper specification
+ The difference between the upper specification and the lower specification for a process is 0.50. The standard deviation is 0.10. Based on the given information, the process capability ratio, Co-cround your rosponso to two decimal places). Based on the process capability ratio (C) for the given information, one can say that the process is to produce within the design specifications not at all capable barely capable very much capable