Question: The difference between the upper specification and the lower specification for a process is 0.70 . The standard deviation is 0.05 . Based on the

 The difference between the upper specification and the lower specification for
a process is 0.70 . The standard deviation is 0.05 . Based

The difference between the upper specification and the lower specification for a process is 0.70 . The standard deviation is 0.05 . Based on the given information, the process capability ratio, Cp= (round your response to fwo decimal places). Based on the process capablity ratio (Cp) for the given information, one can say that the process is to produce within the design specifications. The difference between the upper specification and the lower specification for a process is 0.70 . The standard deviation is 0.05 . Based on the given information, the process capablity ratio, Cp= (round your rosponse to two decimal places). Based on the process capability ratio (Cp) for the given information, one can say that the process is to produce within the design specifications. very much capable not at all capable barely capable

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!