Question: The electrical bill for a facility shows a maximum demand of 3 5 0 0 kW at a power factor of 0 . 8 ,
The electrical bill for a facility shows a maximum demand of kW at a power factor of and a consumption figure of MWh per month. An opportunity is identified where through the use of duty cycling where the start and stop times of machines were controlled, it was possible to ensure that one machine less would contribute to the maximum demand. This machine displayed a load under test of
kW at a power factor of The billing structure of the site was as follows: month; kwmonth; First kWh ckWh; Thereafter ckWh; ratchet clause of for six months on max demand.
What is the annual saving for if this opportunity was implemented on the fifth day of March. billing monthly
a
b
c
d
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock