Question: The figure below shows a system with two components C1 and C2 arranged in series (both have to work for the system to work). In

 The figure below shows a system with two components C1 and

The figure below shows a system with two components C1 and C2 arranged in series (both have to work for the system to work). In addition, C1 has a backup unit C3 (in parallel). In addition, C2 has a switch, S, to turn it on. Both the switch and C2 have to work for the couple to work. If the reliability of the components are as given below, what is the system reliability? System reliability is: (round your answer to four decimial places)