Question: The figure below which represents the relationship between the time and cost for the Design Phases. The total time of the project was 2 0

The figure below which represents the relationship between the time and cost for the "Design Phases". The total time of the project was 200 days. The cost of the schematic phase is 1500 USD. Mention the project design phases (from A to D). What is the cost of the project in USD? Note! The preliminary design was given the lowest possible percentage of the overall design.
a.100,000
h.200,000
c. None
d.75,000
e ,275000
f.50,000
g.225,000
h.150.000