Question: The following sequence shows four operations steps for an ECG lead wire assembly process and the effective capacity of each. Which step has a bottleneck?

The following sequence shows four operations steps for an ECG lead wire assembly process and the effective capacity of each. Which step has a bottleneck? Cutting: 1,500 wires/hour, Stripping: 1,450 wires/hour, Soldering: 1,500 wires/hour, and Over molding: 1,500 wires/hour.
A. Cutting
B. Stripping
C. Soldering
D. Over molding