Question: The following values were found from the corrected load versus penetration curve after completing a CBR test. Load at 2.5mm penetration = 550kg and

The following values were found from the corrected load versus penetration curve after completing a CBR test. Load at 2.5mm penetration = 550kg and at 5mm penetration = 936kg. Based on the above values Find: 1) CBR values for 2.5 mm penetration and 5.0 mm penetration. 2) Find the reported CBR value. CS Scanned with CamScanner
Step by Step Solution
3.52 Rating (159 Votes )
There are 3 Steps involved in it
Solution Given Data STEP I Values were founed from the coectoedloud ver suj penetraatio... View full answer
Get step-by-step solutions from verified subject matter experts
