Question: The foundation shall be cast at level - 2 - F m , while the top level of the ground slab is + 0 .
The foundation shall be cast at level while the top level of the ground slab is
All columns are connected with ground beams under the ground slab. The ground beams have
a width of by a height of on the other hand, All the columns are connected on
the typical floors by concrete beams with a width of and a height of
The thickness of the ground slab is whereas, the slab thickness of other floors is ranged
between to and should satisfy the following equation:
Slab Thickness
You are required to generate and deliver the structural drawings package with a proper scale, which
should include the following:
Axes of columns plan,
Foundation Plan,
Ground floor Structural Plan,
Typical floor Structural plan, and
One section through the whole structure between axes and without stairs
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
