Question: The hammer making process is shown in the figure, and the process include three steps: 1. Machining: Each machine requires a set up time about

The hammer making process is shown in the figure, and the process include three steps: 1. Machining: Each machine requires a set up time about 80 minutes. It takes 7 minutes for one machine to process one unit. 200 units are processed in one batch. There are two identical lines which can work simultaneously. 2. Assembly: Manual by two workers (no set up). Each hammer requires 40 minutes processing. 34 workers available. 3. Pack and ship: 30 minutes set up, 2 minutes per unit processing. Lot sizes of 100. Given the above information, what is the throughput capacity at the machining step per hour? Machining Assembly pack and 2 workers ship Machining Given the above information, what is the throughput capacity at the machining step per hour ? O 7.4 units per hour 4 units per hour 13.64 units per hour 16.22 units per hour Previous Next
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts