Question: The letaba Mining Consortium is currently engaged in mining operations within a steeply dipping large massive copper - gold ( Cu - Au ) deposit,

The letaba Mining Consortium is currently engaged in mining operations within a steeply dipping large massive copper-gold (Cu-Au) deposit, situated at depths ranging from 100 m to 1,000 m. The deposit spans an area 7 km long and 4 km wide, with scattered mineralization zones. This project focuses on extracting the LT008 mineralised zone, which has an average width of 30 m and extends longitudinally for approximately 500 m, with an average height of 300 m. The target production from LT008 is 30,000 metric tonnes (t) per day which includes planned dilution of 15%. Previous mining activities primarily employed open-pit methods, reaching depths of up to 500 m.
The estimated average grades for copper (Cu) and gold (Au) are 3% for Cu and 5 grams per tonne (g/t) for Au. The recovery rates at the processing plant are anticipated to be 98% for Cu and 97% for Au. Copper represents 75% of the Mineral Resources and Reserves. For the life of mine, the price of Cu is projected to average approximately US$9,240.30 per metric tonne (t), while the price of Au is forecasted to average US$2,343.30 per troy ounce (oz). Conversely, the anticipated all-encompassing mining costs per unit for Au are expected to amount to US$5,000/t and US$1,500/oz for Au.
Geotechnical conditions dictate a maximum stope span of 25 m, incorporating rib and sill pillars of 5 m thickness and a 10 m crown pillar.
INSTRUCTIONS:
Your task as mining engineering students is to design and schedule mining operations for one level, ensuring the achievement of the required daily production of 30,000 metric tonnes (t) per day from this level.Develop a backfilling strategy to ensure the stability of excavated stopes and minimize subsidence,Evaluate different backfill materials and methods and select the most efficient method of backfill,Specify the equipment, logistics, and quality control measures for backfill placement) remember that the mining method you have used is sublevel stoping

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!