Question: The machining time per piece is 0 . 2 6 4 h , and the machine loading time is 0 . 0 1 5 h

The machining time per piece is 0.264 h, and the machine loading time is 0.015 h. With an operator rate of $15/h and a machine rate of $21/h, calculate the optimum number of machines for lowest cost per unit of output.