Question: The material flow matrix for 10 departments is given below. The area requirements are a. Determine a final adjacency graph using the graph-based method. b.

The material flow matrix for 10 departments is given below. The area requirements are a. Determine a final adjacency graph using the graph-based method. b. Construct a block layout based on the adjacency graph in part a