Question: The maximum possible cycle time in a flow shop layout is determined by the: A. shortest task time B. average task time C. longest task

The maximum possible cycle time in a flow shop layout is determined by the:

A.

shortest task time

B.

average task time

C.

longest task time

D.

total task time