Question: The mean time between failures for a certain production machine is 250 hrs and the mean time to repair is 6 hrs. The availability of
-
The mean time between failures for a certain production machine is 250 hrs and the mean time to repair is 6 hrs. The availability of the machine is:
A. 0.973
B. 0.024
C. 1.024
D. 1.025
E. 0.976
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
