Question: The minimum project completion time is determined by (a) finding the shortest path through the project network (b) finding the longest path through the project

The minimum project completion time is determined
The minimum project completion time is determined by (a) finding the shortest path through the project network (b) finding the longest path through the project network (c) totaling the time required to do all jobs (d) totaling the slack times of all jobs. 2. Which sequence is best to minimizing the average job lateness: (a) FCFS (b) SPT (C) EDD (d) LPT